Skip to main content

CBSE Class X Science Chapter 1

 

Activity

Decomposition of Ferous Sulphate


Decomposition of CaCO3


Decomposition of Lead Nitrate


Electrolysis Of Water


Decomposition of Silver Chloride


Decomposition of Silver Bromide


Barium Hydroxide & Ammonium Chloride


Iron Nail in Copper Sulphate


Zinc & Copper Sulphate displacement Reaction


Lead & Copper Chloride



Sodium Sulphate & Barium Chloride Double Displacement Reaction


Lead Nitrate & Potassium Iodide


Oxidation of Copper


Reduction of Copper Oxide


Questions

Extracting Metals from their Oxides


Thermite Reaction



Comments

Popular posts from this blog

CBSE Class 10 Chemistry Chapter 3 Metals & Non Metals

Metals and Non-metals 3.1 PHYSICAL PROPERTIES 3.1.1 Metals The easiest way to start grouping substances is by comparing their physical properties Activity 3.1 ·         Take samples of iron, copper, aluminium and magnesium. Note the appearance of each sample. ·         Clean the surface of each sample by rubbing them with sand paper and note their appearance again. After rubbing with sand paper metal is shining. Metals, in their pure state, have a shining surface. This property is called metallic lustre. Activity 3.2 ·         Take small pieces of iron, copper, aluminium, and magnesium. ·         Try to cut these metals with a sharp knife and note your observations. ·         Hold a piece of sodium metal with a pair of tongs. CAUTION: Always handle sodium metal with care. Dry it by pres...

SITE ACCEPTANCE TEST

  SAT (Site Acceptance Test) Site acceptance test is test to verify the Automation system like DCS (Distributed Control System) & Subsystems are well connected & communicate with each other without having any Hardware or software failure. SAT activity requires involvement of MAC Contractor, EPC Contractor, Subsystem Vendor.         MAC (Main Automation Contractor i.e., Honeywell, Yokogawa etc.) should prepare SAT procedure & submit to PMT (Project Management Team) for approval during CDR (Critical Design Review). DCS (Distributed Control System) SAT also includes Integration Test with various Sub System or Package PLC (programmable logic Controllers) EPC (Engineering Procurement Construction) Contractor coordinates & manages Integration Test activity with sub system vendors. EPC ensures DCS is ready for SAT Like ensuring all Eng/HIS( DCS Engineering Stations), all HIS(Human Interface Station), All DCS System Cabinets(Pro...